Saturday, March 8, 2014

Electric cable bridge

Continuing the tradition of sharing engineering knowledge through pictures, today I am sharing with you some pictures of cable bridges for electrical cables.

Picture 1 – An existing electric cable bridge

(Click on the picture to enlarge it)

================= RELATED ARTICLES: Underground street light cables |  Underground electrical manhole | Compound lighting storage yard  | Compound Lighting Installation Pictures  | Feeder pillar single line diagram  | Bollard light pictures  | Feeder pillar hazard pictures  | Compound lighting foundation size | Architectural Lighting | Electrical installation pictures
================ 



When the idea of this post popped up in my head, I typed in the Google search for the word "cable bridge".

The results were not what I expected. Instead of bridges for electrical cables, the results were mostly on real bridges employing suspension cables to transfer the bridge loads to the bridge columns and the foundation

Then I tried "electric cable bridge", the results were a little better. Google was still not giving me much information electric cable bridge that I need.

Lastly I keyed in "electrical cable bridge". The results were just almost the same as the electric cable bridge.

I was disappointed. I guess not many people need information on bridges for electrical cables.

So the title of this new post was confirmed by the lack of websites providing information on this topic.

Well, I am not going to write that much either. I am just going to share with you a few photos on this matter.

Picture 2 – Location of the new cable bridge


(Click on the picture to enlarge it)

The M&E manager of the main contractor in one of my earlier projects came to my office one day and said, "I cannot complete the underground cable containment for the authority by the end of the month."

I said, "Then you have a 200,000 dollar per day of penalty on your head, my friend. That is one million per week. It's in your contract."

Then he explained to me that there was a very small stream crossing the route of the 33kV underground cable containment where he was going to lay the underground ductbank.

The location of the stream crossing was outside this contract package boundary. Not many of us (including me obviously) have actually done a thorough inspection of the area yet since the construction of that part of work has not yet started.

To make it worse, this contract has a peculiar schedule which requires that the authority's 33kV substation should be handed over to them at the beginning of the project instead of at the end as was the usual practice.

To make the story short, this cable bridge was overlooked in the design drawing and now the design consultant need to quickly come up with a complete design for the electric cable bridge.

I assisted with whatever I could to provide the consultant's design office with information so that they can complete the design quickly.

Part of the assistance was to go around taking pictures of existing electrical cable bridges. This could help us design a similar one that would be acceptable to electricity supply authority.

Since the cable bridge was to be part of the 33kV cable containment for the authority's incoming supply cable to the project, then the cable bridge was also to be handed over to them after completion.

I am showing to you here a few of the pictures that I took, including the new cable bridge that we built.

Picture 2 above shows the location of the small stream along the route of the 33KV authority supply cables.

Observe the existing water supply pipe over the stream.

After some investigation, we found out that the pipe was installed by the water supply authority five to six years earlier as a provisional infrastructure for future development because there was a huge empty land area in the vicinity.

Picture 1 at the top of this post was one of the existing electric cable bridges that I visited.

It was carrying 33kV supply cables for a large residential are there.

Picture 3 - A view of the cable bridge from below


(Click on the picture to enlarge it)
Note the large residential development behind the bridge.

When I said "large residential development" it does not mean that the area only has residential building such as high rise apartment, bungalows and terrace houses.

Nowadays large residential developments are developed complete with their own commercial centers at strategic locations throughout the development.

So from electricity supply point of view, the supply infrastructure must be adequate for the KW demand of not just the planned development, but also for any unanticipated further growth as a spin-off from this development.

Picture 4 - A view of one end of the electric cable bridge

(Click on the picture to enlarge it)
This is one of the cable bridges.

Observe how the red PVC ducts leave the bridge and enter the large above-ground cable trough.

Well, this is not an above-ground cable trough, but it needs to come up above ground as it approaches the bridge end in order to protect the cable ducts leaving the bridge.

Note that this is a 33kV cable ducts as is obvious in the following picture.

Picture 5 - Front end view of the cable bridge

(Click on the picture to enlarge it)
Observe the protection measures employed in order to prevent the public from climbing onto the bridge or access the PVC cable ducts.

I know that some readers think that I made a mistake by typing "PVC" cable ducts.

Many people have the opinions that normal PVC ducts is a bad choice in this type of applications because the ultra-violet (UV) ray from the sun will turn the PVC ducts into "crispy biscuits" relatively quick.

Actually that was my opinions too.

But the electricity supply authority have a very different opinion and they have thousands of bridges like this installed throughout the country.

I think their experience outweighs our opinions on this matter for this particular application.

In any case, the new cable bridge in my project was to be handed over to them.

The design of the new electric cable bridge itself had to be submitted to their office for approval prior to construction of the bridge or fabrication of the steel structure at the factory.

Picture 6 - Another view

(Click on the picture to enlarge it)
I think this is the best single view of the existing bridge because it the whole complete system that is viewable.

Picture 7 - The new electric cable bridge has been completed

(Click on the picture to enlarge it)
Picture 8 - This give an overall view of the cable bridge "system"

(Click on the picture to enlarge it)
Here you can see the overall "system" of the cable bridge.

Beginners please note the partially above-ground cable trough connecting one end of the bridge to the underground cable-pulling manhole.

The other side of the cable bridge was implemented similarly.

Observe at the far background in the picture that there was a long red-and-white "thing".

This was new jersey barrier units lined up along that side of the main road.

It was along this main road that the 33kV incoming supply of the authority would be taken from via a loop-in loop-out method.

Picture 9 - Cable bridge construction in progress

(Click on the picture to enlarge it)
This is the last picture for today. I show this one for those who are interested in the bridge column and foundation.

You cannot see the foundation, but it was not a pile-type. The foundation was constructed as a simple large plate without piling.

Okey guys. That is all I can give today.

See you again in the next post.



Copyright http://electricalinstallationwiringpicture.blogspot.com/ Electric cable bridge

Wednesday, February 12, 2014

Electric transmission lines across Nile River

Only one picture today: a photograph of a high voltage transmission line across the Nile River in Egypt.



Hello everyone. It has been quite a while since my last post. In fact I only sent just a few posts for the whole of last year,  2013.

For that I owe some apologies to loyal followers of this blog. I know that a considerable number of young engineers find many pictures here useful for them.

I also noticed in the past one year that many students follow this blog.

Again, please accept my apologies. It has been a really busy season for me in the past one year or so.

That is a fact of life for many of us in the construction industry. In some projects the work demands sometimes suck the life out of us. This is no joke.

Okey,  folks. That's enough hugs and kisses. Now back to the above picture.

It must seem a bit unusual to regular readers that I post this kind of picture. Usually the pictures are about cables,  wiring,  etc. Definitely not about high voltage transmission lines.

Actually I am running out of new pictures and this is the type of new ones that I have.

With this picture also I am announcing that I am now in Egypt. In Cairo to be precise.

Currently I am taking Arabic courses here while searching for a job. Not a job in Egypt,  but in other Middle-East states. Probably in Saudi,  UAE or Qatar. Being new in this region I will probably accept the first offer that I get to minimize the risk of being unemployed too long.

Today also is the day that readers can see my identity. All the while this blog has been deliberately developed and vigorously experimented to suit fundamental SEO (search engine optimization) principles and to maximize readers' clicks on Google's advertisements.

It was easier for me to do so if I kept my identity hidden. I knew this made the blog somewhat un-professional,  but then I never meant for it to be a professional blog in the first place, and I still don't.

So why expose my identity now? I will explain that some other time. As for now, those who wish to contact me can visit my facebook page as before. Or they can visit my LinkedIn page as indicated by the link below the picture above.

Readers may also soon notice that I am gradually revising a number of my earlier posts since this blog is now indirectly associated with my professional public image.

Okey guys. I need to switch off now, but I will see you all again soon enough.

Chowww !!

Note: I am sending this post from my Samsung Note. It's kind of ackward to type long posts using this thing.

And photo editting is also another problem.

Copyright http://electricalinstallationwiringpicture.blogspot.com Electric transmission lines across Nile River

Saturday, June 8, 2013

Underfloor trunking below structural rebars

Below is a picture of a somewhat "improvised" installation of underfloor uPVC trunking within the structural rebars of a floor slab in a workshop building under construction.

Picture 1: uPVC trunking installed below structural rebars



===== RELATED ARTICLES: Underfloor trunking pictures | MATV trunking riser |   Conduit to trunking connections |  Cable ladder pictures | Electrical conduits and trunking pictures | Electrical panel under water pipes  | Electrical busduct installation pictures | Electric conduit installation pictures  | Electric trunking installation pictures | Site-fabricated electrical trunking | Electrical installation pictures

===========

I have published quite a number of pictures on underfloor trunking systems.

Below is an example which was been posted in May 2010.

Picture 2: An under trunking system at a highrise office building



These underfloor trunking systems, together with their floor draw boxes (i.e. junction boxes) and floor service boxes, have so far been installed inside the concrete screeding of the concrete floor.

In this installation method, the reinforced concrete floor slab is constructed first.

However, the construction of the concrete floor is not yet completed with the completion of the reinforced concrete.

A layer of concrete 50mm to 75mm thick is to be poured and leveled on the finished reinforced concrete to make a finished concrete floor. This layer is called 'concrete screeding'.

It is within this top concrete layer that an underfloor trunking system is installed, or "embedded" as some people call it.

However, in the new picture that I showed above, the underfloor trunking is not installed in the screeding layer (In fact there is no screeding layer here).

The finished floor level here has been designed to be just 50mm above the top of the top of topmost reinforcement steel bars (called "rebar").

With the size of the uPVC trunking of 75mm wide x 25mm height, there would only be "approximately" 25mm thick of concrete above the uPVC ducts.

This concrete thickness is insufficient and it can eventually crack even in a "light duty" environment such as office floor. It will not last very long here ... it's a workshop.

So in this case the contractor had no choice but to install the trunking between the steel rebar mesh. If it had been two layers of reinforcement provided, then the trunking would be installed between the layers.

Picture 3: Close view of a service box opening




As you can see there are also added reinforcement bars around the opening for the underfloor service box.

When I took this picture the structure engineer has not yet inspect the underfloor trunking installation work.

They have inspected them once and had a few major comments.

One of the comments that I wish to share with you is that the uPVC trunking should not be touching the steel reinforcement bars.

The photo below shows how the installation was before it was corrected.

Photo 4: uPVC trunking touching steel reinforcement




At the areas where the trunking touches the rebars, the grip of the concrete material onto the reinforcements would be weaken. This may weaken the strength of the finished reinforced concrete.

How much weaker? Well, I did not really ask. My guess was that even the site structural did not really know "how much weaker".

Photo 5: The corrected trunking installation




In the above picture, the trunking installation was adjusted to leave some gap of around 15mm or more between the trunking and the steel reinforcement.

You can still see the rust marks on the trunking where they touched each other earlier.

Beginners please do not get confused here. The white rectangular boxes connecting the underfloor trunking are not the real underfloor junction boxes or service boxes.

They are just some polystyrene foam materials (the same material some people uses as refrigerator insulators) that are used to create openings for the real junction and service boxes that will be installed at a much later date.

If the contractor installs the boxes now, they will be damaged in a very short time.

OR STOLEN! ... I can almost feel some readers quickly nodding their heads in agreement ...

Okey guys. This is all I can write today. I will post a few more other pictures on this soon.

Copyright http://electricalinstallationwiringpicture.blogspot.com Underfloor trunking below structural rebars

Friday, May 17, 2013

Exothermic welding: Cable to cable connections

Just a few pictures today … on exothermic welding joint of earthing copper cables.

Picture 1: Cable-and-mould set-up for a cable-to-cable exothermic joint
(Click on the picture to enlarge it.)

=================
RELATED ARTICLES:
Electrical Grounding Electrode Pictures | Electrical grounding  | Substation main earth bar pictures  | Switchboard earthing pictures | Lightning Earth Rods Installation | Temporary Electrical Earthing Pictures | A simple electrical installation |  Electrical installation pictures

=================

The above picture shows the set up for a cable to cable connection.
For the uninitiated, I have labeled the components in Picture 01 and show them again in Picture 02 below.

Picture 02: Exothermic welding process set-up labeled
(Click on the picture to enlarge it.)

I will not write much today and I have serious doubt that I will be able to write long posts again in the near future.

The best I can do is to show you some pictures. When I have more time I will write longer.

Note that the part that I labeled “explosive powder” is not really explosive powder. Well, It IS explosive, but it is not an EXPLOSIVE.

It is actually some powdered mixture of copper oxide and aluminium. When ignited, the mixture produces a very high temperature reaction that molten the copper and aluminium components which then flow into whatever cavities between the conductors to be joined, as well as form a thick layer of alloy envelope around them.

This you can see in Picture 07 below.

Picture 03: Just a closer view of the mould.
(Click on the picture to enlarge it.)

Picture 04: A shot during the combustion
(Click on the picture to enlarge it.)

Picture 05: A cable-to-cable joint still red-hot
(Click on the picture to enlarge it.)

For the curious, the earthing cable conductors in the pictures are 95 mm.sq stranded copper cables.
This installation was part of an earth mat type earthing system. High voltage substations for voltages 33kV and above usually have some sort of “step voltage” protection and the earth mat or earth grid is part of the “step voltage protection system”.

For beginners who have no idea at all of what all this means, have no worry. I will send a post or two on “earth mat” and “step voltage“ soon.

Picture 06: A completed cable-to-cable joint
(Click on the picture to enlarge it.)

Picture 07: A closer view of the finished exothermin joint.
(Click on the picture to enlarge it.)

Okay, folks. See you in the next post.

Jimmy Lee Wan Seng
(Information Trader)

Copyright http://electricalinstallationwiringpicture.blogspot.com Exothermic welding: Cable to cable connections

Tuesday, January 22, 2013

Fire Riser Rooms

Below you can find two pictures showing fire riser rooms at a multi-storey building.

Picture 1 - Fire Riser Room


=================
RELATED ARTICLES: Building’s electrical rooms layout | Substation rooms layout diagram |  1600 kVA Transformer Pictures | Cable ladder pictures  | Electrical installation pictures |
=================

Here you can see wet riser pipes and hose reel pipes.

For the uninitiated, wet risers are vertical pipes that are always under pressure with water.

This means that any time a fire occurs in a building, you will have water to fight the fire immediately. You can connect the flexible hose provided in the riser room or the riser shaft at each floor to the landing valve of the vertical wet riser pipe.

The hose reel system is also part of the fire fighting system in a building.

To be precise, this is what you can and will use to fight fire when it happens. The wet riser are designed for use by firemen.

The hose reel pipes are also kept under pressure at all time. The system are provided with pumps that operates automatically to keep the hose reel piping under adequate constant pressure at all times.

The water jet produced by the hose reels are however only adequate to fight small fires. That is why firemen will not use it. It is designed for use by building occupants BEFORE firemen arrives.

Dry risers, on the other hand, are similar to the wet riser piping, but without the water. They are simply vertical pipes without water. The water needed to fight fire will be from the fire trucks brought in by the firemen when they arrive.

The above is a highly simplified brief of the fire risers to give casual readers some meaning of what they are.

I will post a more detailed explanation of the fire fighting systems for buildings in a near future.

Picture 2 - Chilled water pipe installed inside a fire riser shaft.


Here you can see a vertical  pipe that may not belong here.

This is a chilled water pipe.

Some fire authorities may not allow other services to be installed inside the fire riser shaft. It was allowed in this project.

Copyright http://electricalinstallationwiringpicture.blogspot.com Fire Riser Rooms

Monday, January 21, 2013

Architectural Lighting

I do not know how many readers will like this picture, but I like it.

Picture 1 - A nice picture



================ RELATED ARTICLES: Compound Lighting Installation Pictures |  Electric Cable Drum Pictures | Underground street light cables | Compound lighting storage yard | Feeder pillar single line diagram | Bollard light pictures | Feeder pillar hazard pictures  | Compound lighting foundation size  | Electrical installation pictures |  Temporary lighting installation pictures
================


A few may even question whether it does qualify into the category of electrical pictures.

This is actually a photoshot of the top of a bridge at night. The bridge shines out nicely as it reflects the light rays from light sources installed at ground level.

It is true that this is actually an architectural work.. architectural lighting to be precise.

However, the architects need electrical engineers to to handle these high power lighting, especially since the lighting is actually installed at public areas.

Picture 2 - One of the light sources at ground level.






I have been silent for many months from this blog. Today I am coming back.

I however have not decided yet what themes I am going to use to upload pictures this time. So I decided that I should start slow and use whatevers pictures that I can snap around me.

That is why I show you this picture.

The are a number of nice bridges here and I can try to take a few shots.

See you in the next post.

Copyright http://electricalinstallationwiringpicture.blogspot.com Architectural Lighting

Saturday, February 11, 2012

Backhoe, the cable trench excavator

Backhoe, the multi-purpose, versatile machine can be found anywhere there is a construction work under way. It is also the most popular type of machines for excavating electric cable trenches.

Thus this machine deserves a post of its own.

Picture 01 – A backhoe being used to handle an electric cable drum
(Click on the picture to enlarge it)

================= RELATED ARTICLES: Electric Cable Drum Pictures |  Underground street light cables |  Underground electrical manhole | Compound lighting storage yard  | Compound Lighting Installation Pictures  | Feeder pillar single line diagram  | Bollard light pictures  | Feeder pillar hazard pictures  | Compound lighting foundation size
=================

Observe the heavy duty steel chain and the steel pipe being used to lift the wooden cable drum.

A backhoe basically consists of three major sections as shown in the following picture.

Picture 01a – The three sections of a backhoe
(Click on the picture to enlarge it)

There are basically three sections of a backhoe: the tractor section in the middle, the front loader section, and the “backhoe” section.

The tractor section is the driving force and the controller section. This is the moving vehicle with four tires and it is here that the driver sits. You can see the driver (i.e. the machine operator) sitting under the metal hood at the center of the machine in the above picture.

The backhoe operates the rear and the front tools (the rear shovel bucket and the big front loader bucket) using two controllers at the tractor section: the controller for the front loader is at the front of the driver’s seat, while the controller for the rear bucket is located behind the seat.

Usually a task requires the operation of only the front or the rear bucket at a time.

Therefore if a task mostly requires the operation of the rear bucket such as excavating a narrow trench, the operator would just swivel the chair around.

Even though the operator is able to work comfortably facing both the front and back of the machine, the operator would be facing the front loader during normal driving. That is the right side of the picture in Picture 01a above.

Picture 02 – Another view of a cable drum lifting scene
(Click on the picture to enlarge it)

Picture 03 – A backhoe repairing a road ground level
(Click on the picture to enlarge it)

Picture 04 – Backfilling a cable trench with the excavated earth
(Click on the picture to enlarge it)
Picture 05 – Backfilling a cable trench
(Click on the picture to enlarge it)

Another picture showing the machine pushing the excavated earth to backfill the cable trench.

Observe what appear like two lengths of cables coming out of the cable trench at two locations.

These two locations are among the locations of the road light poles.

What appears like two lengths of cables coming out of the trench are actually one single length of cable that has been pulled out to form a loop at a road light pole.

A single circuit from a feeder pillar is normally designed to supply six poles regardless of the wattage of the lamp at each of the six light poles.

The first five of the poles starting from the supplying feeder pillar would have the cable loop coming out of the cable trench like in the picture.

The last pole in the circuit (i.e. the furthest from the supplying feeder pillar) would have just “one cable length” coming out of the trench, unlike “two lengths” as in the picture.

Beginners who are still confused about the “two cable lengths” should look at the following picture. It should clear the issue.

Picture 06 – A light pole foundation and the looping cable ready for the installation of the light pole

(Click on the picture to enlarge it)

One more point that beginners should note here is that the underground road light cables are installed BEFORE the installation of the light pole foundation.

I will upload some pictures on the installation process of the light pole foundation in a future post.

Picture 07 – A cable drum identification tag containing some details of the cable including the cable drum weight
(Click on the picture to enlarge it)

This picture shows a cable drum identification tag. The drum carries 310 meters of 95 millimeter square multicore XLPE armored cables.

It weighs 2030 kilograms. Therefore it is not that easy to handle the cable drum (other than rolling it, which is a futile attempt most of the time at a construction site) and install the cables into a cable trench without the assistance of a machine.

Copyright http://electricalinstallationwiringpicture.blogspot.com/ Backhoe, the cable trench excavator

Underground street light cables

This post gives you a few pictures showing the process of installing underground street light cables.


Picture 01 – A contractor’s site supervisor giving instructions during backfilling of an underground cable trench

(Click on the picture to enlarge it)

================= RELATED ARTICLES: Electric Cable Drum Pictures |  Underground electrical manhole | Compound lighting storage yard  | Compound Lighting Installation Pictures  | Feeder pillar single line diagram  | Bollard light pictures  | Feeder pillar hazard pictures  | Compound lighting foundation size | Architectural Lighting
================


Type of activities: Installation of underground cables for street lights

Location: Internal road of an office building complex

Type of building: Multi-storey office building

Other description:

The picture above was taken during the installation of underground street lighting cables.

This project was the construction of a considerably large multi-storey office building complex.

Being a government office building with large numbers of public service counters, there were a sizeable parking lots around the building.

Therefore a considerable number of carpark lighting and street lighting had to be installed in this project, and all cables to the lighting poles were installed underground.

As usual, for projects like this I always insist that at least two and a half feet of cover is provided above the top underground cable.

This means that the depth from the completed surface of the ground or the internal road to the top of the cables is not less than two and a half feet (or 750 millimeters).

This is to ensure that the cables are not damaged from the force at the ground surface from moving vehicles and other loads.

Repairing damaged underground cables can be a messy and costly affair. It is embarrassing too, if the building have just been commissioned.

In actual installation, however, this cable depth from the finished ground level cannot always be met because of either technical difficulties or excuses cooked up by the cable laying contractor to keep the excavation as shallow as possible.

The deeper the depth of the cables, the more excavation works that need to be done. After the cable installation is completed, the excavated cable trench need to be backfilled and compacted. In short, the deeper the cable trench is, the more work and time is needed and therefore the cost is more.

A cable laying contractor would always try to find some reasons to reduce the cable trench depth to as shallow as possible. Among the usual reasons is the presence of underground sewage pipes, water supply pipes, road crossing culverts, etc.

Some of these reasons are valid, some are just excuses.

However, under many circumstances, the two and a half feet depth of cover just cannot be met especially for street lighting works within a building compound.

In these cases, the solutions are adopted on a case by case basis.

In general, a cover as shallow as 450 mm or 500mm can still be adopted depending on the usage of the finished ground surface above the cables.

If the maximum depth of cover that can be given is less than 450mm, then the cable can be installed in underground steel conduits or PVC conduits encased in concrete.

These two methods are conventional methods that have been around for many years.

Whatever the solution adopted for a particular situation, the reliability of the installed underground cables should be given a top priority because repair works on underground cables is relatively costly and messy.

Below is a rough guide of the process involved in the installation of underground street lighting cables. This only gives an overall view of the process. I will upload a cross section view of the cable trench in a future post.

Before any work on the underground cable installation commence, the contractor should obtain the latest approved design from the design consultants.

This is not just drawings for the street lighting and other underground electrical cables. Preferably the layout drawings of all external services need to be studied.

Normally this sort of design coordination is the responsibility of some engineers from the design consultants with the input from the main contractor’s site coordinators.

However, a building construction work involves many parties and many people. Along the line, it is highly likely that someone overlooks something or simply makes a major mistake.

In the end, the cost of the rectification that resulted from the mistake is absorbed by the cable laying contractor or the electrical contractor first.

Attempts can be made to recover the losses from the party that make the mistake. However, it usually not easy to recover the additional cost from mistakes such as this.

Therefore the best approach is to make sure that the drawings used are the latest design drawings for all underground services, and the latest architectural drawings for the external works are studied before the cable trench excavation commence.

Before underground cables are laid, the cable trench must be thoroughly inspected. There should not be any debris and sharp object in the trench.

A layer of clean sand approximately 3 inch thick shall be installed at the bottom of the trench before the cables are laid. The three inch sand bedding is the thickness after compaction, not the sand thickness while it is being spread over the trench bottom.

The following picture shows a worker compacting the sand bedding with a mechanical rammer.

Picture 02 – A worker compacting the sand bedding with a mechanical rammer



(Click on the picture to enlarge it)

Observe the width of the mechanical rammer. It is about 12 or 14 inch.

The width at the bottom of the trench is only about 2 to 3 inch wider than the rammer width. This rammer size is about the smallest that I have seen. I have seen a few bigger sizes, but this is about the smallest one.

If the “bucket” used by the excavation machine to dig the cable trench is too narrow, this mechanical rammer might not have enough clearance to do the compaction.

In one of my earlier projects, the electrical contractor used a very small bucket to dig excavation trench for a street lighting underground cables.

Because the route of the cables ran around tight corners at a number of locations, a narrow excavation bucket was more convenient. The work could also be completed faster.

On top of that, the amount of sand bedding that needs to be used below the cables and sand cover above the cables could be much reduced (i.e. cost saving) if narrower bucket was used.

The contractor started work on one Friday afternoon and by Monday morning, all cables had been laid. In the Monday morning, they called for a formal inspection so that they could commence the backfilling work.

Too bad. I told them that the sand bedding had to be compacted to 3 inch thick, not just spread over the trench bottom to a three inch thick.

Compacting the sand was one thing, but the cable trench was too narrow for even the smallest mechanical (about the size in the above picture) rammer to go in.

I did not know exactly why the electrical contractor dared to gamble like that on that occasion. They already knew I always insisted on following the specifications when it came to underground works in that particular project (which was also a government office building project).

In the end, they had to take out all the cables that had been laid in the trenches and re-excavate the whole length of the cable trenches again with a bigger excavation bucket.

Double-work, and doubled the cost.

The picture below shows an excavation machine used to do excavation for cable trenches. Here we call this machine a “backhoe”. It is not an “excavator”. An excavator is a much bigger machine.

Picture 03 – An excavation machine commonly used in excavation of cable trenches

(Click on the picture to enlarge it)

During an underground cable laying, the cables should be laid on the sand bedding in an orderly manner. They should not cross or overlap each other.

After the cables have been laid and properly arranged, another layer of 3-inch clean sand should be laid over the cables as a cover.

This 3-inch sand cover also should be the thickness after compaction.

In some projects, the contract specifications do not specifically say that the sand bedding below the cables should be compacted first before cable laying process.

In cases like this, I might choose to allow the contractor to do the compaction after placement of the 3-inch sand cover.

If this method is adopted, then care should be taken so that the workers keep the cables at approximately the middle of the 7-inch compacted sand thickness (3-inch below the cable plus 3-inch above the cables plus one to one and a half inch cable diameter).

In the picture below, the sand bedding and the sand cover was being laid in one go and later it would be compacted.

Picture 04 – Sand bedding and cover being placed in one go inside a cable trench

(Click on the picture to enlarge it)

Beginners should not get confused here. Sand “bedding” is the word used for the layer of sand below the cables.

The sand “cover” is the layer above the cables, that covers them.

The words “bedding” and “cover” are widely used across many engineering disciplines that involve underground works.

After compaction of the sand cover, a layer of protective covers of some type should be place over the sand, right above the cables with overhang of at least one inch on each side of the cables.

In the old days, clay bricks are used as the protective covers.

The purpose is to let people doing excavation work later in the vicinity of the underground cables that once the excavation uncovers these clay bricks, it should warn the excavation operator that there are electrical cables underneath and therefore he should proceed with caution to avoid damaging the cables.

Later, about 15 or 20 years ago, there appeared some common opinions among electrical contractors are that the clay bricks could not protect the cables.

Often excavation operators did not take the uncovering of the clay bricks as a warning of electrical cables underneath because the in some locations the clay bricks exist everywhere in the ground as leftovers from previous construction and also from wastes.

The cost of repair to damaged underground cables can be substantial to small contractors that do external works involving excavation.

Simply said, the use of clay bricks could not protect the electrical cables. They could only warn of the existence of electrical cables underneath and often they were not very effective in doing that.

An alternative came in the form of thin PVC tapes that are supplied in the form of coiled long sheets.

The principle behind this method is that the PVC tape cannot be broken easily even when stretched and pulled out of the ground by an excavation machine. A warning telling the type of cables underneath (whether electrical cables, telecommunication cables, etc) are printed throughout the length of the PVC tape.

This method is still practiced today.

However, another alternative appeared a few years ago in a form orange-colored, thin interlocking PVC plates.

This method has been used in most projects that I handle nowadays and is shown in the following picture.

Picture 05 – A worker placing PVC protective covers over the sand cover

(Click on the picture to enlarge it)

Each piece of the PVC plates is embossed (not printed) with suitable DANGER warnings. The printed warning types are still available today, but I always insist on the embossed types because a low quality printed warning can get eroded over time, or due to improper handling during installation.

Picture 06 – PVC protective covers

(Click on the picture to enlarge it)

After the placement of the protective PVC covers, the cable trench is backfilled with good earth and compacted every 6 inch until the finished ground level.

It is also a good practice to top the earth up by about 2 inch above the existing level to allow for settlement of the newly backfilled cable trench.

Often the civil work contractor would continue with the ground finishing work or the road work after the electrical contractor has completed the underground cables installation. They may not insist on the two inch top up.

However, the compaction of the sand layers and the earth backfilling are always an issue between the electrical contractor and the civil or the main contractor of a project. Therefore it is always wise to stick to the requirements of the contract as the minimum.

Many times even the specifications of the contract are not tight enough which leads to disputes between contractors after the cable laying has been completed.

Worse still if the dispute appears just before the handover of the newly completed building to the owner, or just after the commissioning and operation of the building, when some settlement on the finished ground or the finished road begin to appear.

To say it simply, this is one of those areas where a wise judgement on the part of the supervising engineers is needed.


Copyright http://electricalinstallationwiringpicture.blogspot.com/ Underground street light cables

Monday, January 30, 2012

MATV trunking riser

Below is a picture of an MATV trunking riser. I have also shown a closer view of how the trunking is firmly fixed to the ELV riser reinforced concrete wall.

Picture 1 - MATV trunking riser

(Click on the image to enlarge it)

=================  RELATED ARTICLES: Underfloor trunking below structural rebars | MATV antenna bracket pictures |  Lighting flexible conduits |  Conduit to trunking connections |  Cable ladder pictures |  Electrical conduits and trunking pictures | Electrical panel under water pipes  | Electrical busduct installation pictures | Electric conduit installation pictures   | FR electric cable installation pictures    | Underfloor trunking pictures  | Site-fabricated electrical trunking  | Electrical Services Color Codes
===========

Location: Inside the ELV riser

TYpe of building: Office building

Other description:

MATV is an acronym of Master Antenna Television. Nowadays this name is often changed to SMATV, with the letter S added to show that the system can also receive the satellite with just the addition of a satellite dish antenna and a suitable head-end amplifier module.

No other additional parts are needed.

Even though the vertical distribution of the television signal is carried from top or roof of the building downward, it is quite common to call the vertical MATV cabling as the riser cable.

The vertical cables are actually down-feed cables, similar to the distribution of the drinking water supply from water storage tank mounted at the roof a a building.

The water is then fed to individual floors through one or more "main cold water riser pipes".

For electrical cables, it is more common to run vertical main cables on trays.

When trunking are used in ways similar to the MATV trunking is the above picture, they usually are used to carry wiring cables, not the vertical distribution cables.

I guess it is just easir to handle and manage the small wiring cables if the steel trunking is used.

But when the main vertical cables are involved, cable trays are the preferred method most of the time.

Notice also I have marked the enclosure that has been used to mount accesories for the distribution of the TV signals. Things such as the signal boosters, the splitters, etc.

Having the accessories mounted inside the riser next to the riser trunking is not just for the ease of cable connection, but also for the protection of these accessories from damage, theft and vandalism.

This may sound trivial sometimes, but in some buildings these issues are ongoing major problems.

I have also zoomed in to the mounting bracket for the trunking riser as shown in the following picture:

Picture 2 - The mounting bracket for the MATV riser trunking

(Click on the image to enlarge it)

Observe how a set of screw stud is used with a few nut and washers to provide a reliable and easy to implement mounting method for the vertical trunking.

Notice also how the angle iron is extended at this location to provide a nice mounting base for the PVC enclosure.

Copyright  http://electricalinstallationwiringpicture.blogspot.com/ MATV trunking riser